We have used the period between last summer and the winter to begin the initial phase of the planned renovation of the hotel’s sanitary facilities. The sauna has a new floor, shower and sink. The toilets adjacent to the reception area and next to the sauna have been fully renovated. Everything has been given a sleeker, fresher new look so that we can be ready for the years ahead. Most of the ground floor has also been given a fresh coat of paint.
In each of the coming three mid-seasons, we will renovate the bathrooms and toilets of all the rooms on one floor. Once that is completed, lovely new carpet will be installed in the hallways and the walls will be repainted. Lastly, the reception area will be entirely redesigned.